Refurbishment Käppeli 1, Muttenz


Construction costs CHF:
Stage I: 1 million / Stage II: 300,000

Client:
Building co-operative Zum Stab, Muttenz

Architect:
Stage I: Fankhauser Architektur AG, Reinach
Stage II: RTR Baumanagement AG, Basel

Our mission:
Partial services 31 – 41 (in accordance with SIA 108 (2014) Preliminary project with cost estimate, construction project with cost estimate, invitation to tender, tender analyses and contract award application

Project details:

The idea of renovating the kitchens in 5 existing apartment blocks with a total of 100 flats led to a complete renovation of the electrical installations. All lighting installations were refurbished for 13A fuse protection with RCD protection, power connections were redesigned for 3×400 V. The buildings were completely renovated from the house connections upwards, which also resulted in the replacement of the main and flat distribution boards. The result is refurbished residential units that are state of the art for new buildings. Nine years later, the refurbishment of the bathrooms and toilets was initiated. The sanitary facilities in 100 bathrooms were modernised to meet the needs of the residents. For example, the smaller flats have wet rooms with showers, while the larger flats have spacious bathrooms with bathtubs and second separate WCs at the expense of reduced corridor zones. All wet rooms are served by individual fans with controlled supply and exhaust air.


Refurbishment Käppeli 1, Muttenz
The human being in the room is at the centre here in the careful handling of the environment and conditions. The aim is to create a sense of well-being without technical intrusiveness and to make the occupants feel comfortable and to meet their needs in terms of light, media, handling and design without losing any of the functionality and flexibility.