Skip to main content

Au sports centre, Münchenstein


Construction costs CHF:
130‘000

Client:
Building administration Münchenstein


Our mission:
Partial services 31 – 41 (in accordance with SIA 108 (2014)) Preliminary project with cost estimate, construction project with cost estimate, invitation to tender, tender analyses with contract award application.

Project details:

The example of the Au sports facility illustrates the very specific issues of sports grounds. Due to the length of the supply lines, particular attention must be paid to the voltage drop and the short-circuit current. For a lighting calculation, the guidelines of the sport being played are decisive, and the required illuminance levels must be complied with depending on the league and the competition being held. If there are even TV broadcasts, considerable lighting measures are necessary. This determines the number and mounting heights of the candelabra, which are included in lightning protection considerations due to their free-standing nature. If candelabras have to be replaced, the installation often involves the spectacular use of huge pneumatic cranes or even helicopters.


Au sports centre, Münchenstein
Projects in this category are as varied as their subject matter. The great diversity always calls for new approaches.
Color contrast
Text
Highlighting content
Zoom