Skip to main content

Conversion of factory into musicians’ residence, Basel


Construction costs CHF:
600’000

Client:
Habitat Foundation, Basel

Architect:
Buol & Zünd Architects BSA GmbH, Basel

Our mission:
Partial services 31 – 53 (in accordance with SIA 108 (2014)) Preliminary project with cost estimate, construction project with cost estimate, invitation to tender, tender analyses with contract award application, implementation planning, specialist site management, commissioning, acceptance, rectification of defects and inspection documents

Project details:

The former Levy Fils electrical equipment factory at Lothringerstrasse 147-165 has been transformed into the musicians’ apartment block. The 9 residential units each have a soundproofed practice room. The residential offer is complemented by 2 spacious communal flats, each with an area of almost 190m2 and separately connected music rooms, 4 one-room guest flats, 4 practice rooms (2 additionally connected to a recording studio), the ‘Weisser Saal’ performance room, an in-house canteen and a playhouse for the next generation of musicians.


Conversion of factory into musicians’ residence, Basel
The human being in the room is at the centre here in the careful handling of the environment and conditions. The aim is to create a sense of well-being without technical intrusiveness and to make the occupants feel comfortable and to meet their needs in terms of light, media, handling and design without losing any of the functionality and flexibility.
Color contrast
Text
Highlighting content
Zoom