Skip to main content

JazzCampus, Basel


Construction costs CHF:
CHF 1.3 Mio

Client:
Stiftung Habitat, Basel

Architect:
Buol & Zünd Architekten BSA GmbH, Basel

Our mission:
Partial services 31 – 53 (in accordance with SIA 108 (2014)) Pre-project cost estimate, construction project with cost estimate, invitation to tender and contract award application, execution documents, specialist construction management, follow-up of project development, commissioning, handover to the client, construction documentation, monitoring of defect rectification and billing control.

Project details:

Financed by the Habitat and Levedo foundations, the new jazz campus of the Basel Music Academy and the University of Applied Sciences Northwestern Switzerland includes classrooms for ensembles, rooms for individual lessons, performance rooms, practice rooms, recording rooms, control rooms for lessons in recording technology and, last but not least, a jazz club for events. To ensure that pupils and students can learn the finer points of jazz undisturbed at the same time and side by side, the greatest attention was paid to the uncompromising realisation of sound insulation, including ‘room-in-room’ solutions. In order to fulfil the high visual requirements, the fixed installations were largely concealed, which required precise detailed planning in consultation with the architects Buol & Zünd.


JazzCampus, Basel
The handling of light and the required media is important in these buildings. Visual tasks and energy consumption are just as much a focus as sophisticated concepts for work connections, technical equipment and special requirements.
Color contrast
Text
Highlighting content
Zoom